Nick George — AI Agents & Automation

How to follow up on an estimate: a cadence, seven templates, and when to stop

Five touches from the day the quote goes out to a polite close-out, texts and emails written for real jobs, how to track why you lose, and what Jobber, Housecall Pro, and ServiceTitan already do.

Nick George  ·  October 3, 2026  ·  8 min read

The short answer: five touches in about three weeks, then ask to close the file

Text the day the estimate goes out. Check in two or three days later. Call near the end of the first week with other ways to do the job. Mention your schedule only if it's really filling. Around day 21 to 30, ask whether to close the file. Stop the moment they answer, say no, or ask you to stop, and then write down whether you won or lost, and why.

This page starts with the estimate already in their inbox. The steps before it each have their own guide: writing the estimate and the price book behind it, the first reply to a brand-new inquiry, and the texts for calls you miss.

The cadence

From the day it goes out to the close-out text

The days aren't magic. The first two touches land while they're still comparing bids, the options touch comes after they've reacted to the price, and the close-out lines up with the date your price expires, if your estimates carry one.

TouchWhenChannelWhat it saysGoal
1 · SentSame dayText, plus the estimate by emailIt’s sent, which job, how long the price holdsConfirm it arrived
2 · Check-inDay 2 or 3TextDid you look? Points to what they asked about at the visitSurface the unasked question
3 · OptionsDay 6 to 8Call, then emailA smaller scope, another material, or the work in phasesA yes that fits the budget
4 · CalendarDay 12 to 14TextYour next open start, only if it’s true. Otherwise skip itA real reason to decide
5 · Close-outDay 21 to 30TextShould I close this file, or check back later?A yes, a no, or a date
AfterWhen they decideText or emailThe start date, or one question about why they passedStart right, or learn why

The stop rule

Stop the moment they reply (a person takes it from there), say no, say “not now” (set one check-back date), or opt out. After the close-out, send nothing more unless they asked you to check back.

Templates

Seven messages to copy, edit, and send

Written with a residential job in mind, say a roofer in Matthews quoting a replacement. Swap the brackets and cut anything you wouldn't say to the customer's face.

Touch 1 · text

The estimate just went out

Confirms it arrived (an emailed PDF can land in spam) and names the job. The first text says who you are and how to stop.

Hi [First name], it's [your name] with [Company]. I just emailed the estimate for the [job] at [street]. The price is good through [date]. Any questions, reply right here. Reply STOP to opt out.

Touch 2 · text

The check-in

One question, pointed at what they cared about at the visit. It shows you listened.

Hi [First name], [your name] from [Company] again. Did you get a chance to look at the [job] estimate? You asked about [the thing they asked about] at the visit. That's line [#].

Touch 3 · call, then email

Other ways to do the job

Silence after a big number can mean the total. Options let them say yes without haggling, and you pick the trade-offs instead of cutting your price. Call first, then send this so they have it in writing.

Subject: [street]: three ways to do the [job] Hi [First name], In case the total was more than you planned, here are other ways to do it: 1. As quoted: [scope], [price]. 2. Phased: [the part that can't wait] now, the rest in [season]. [price]. 3. Mid-grade: same scope with [the mid-grade option], [price]. Which one is closest to what you had in mind? [your name], [Company], [phone]

Touch 4 · text

The schedule is filling (only if it's true)

Only if your calendar really looks like that. A made-up deadline gets caught the day they call back and you can start Monday.

Hi [First name], [your name] at [Company]. My next open start is [date], then I'm booked into [month]. If you want the [job] done before [season], tell me by [day] and I'll hold it. No pressure.

Touch 5 · text

Should I close this file?

The easiest message to answer, because no is acceptable. Either way you get a status instead of a maybe.

Hi [First name], [your name] at [Company]. I haven't heard back on the [job] at [street], so I'm guessing the timing's off or you went another way. Either is fine. Should I close this out, or check back in [month]?

After · text or email

They said yes

The date, who’s coming, and how to reach you, from the same person who sent the estimate.

Thanks, [First name]. You're on the schedule for [date]. [Crew lead] will text the day before with an arrival window. If anything changes, reply here.

After · text

They went another way

One easy question, and no second pitch. The answer goes in your lost-reason column.

Thanks for letting me know, [First name]. Hope the [job] goes well. If you don't mind me asking, was it the price, the timing, or something else? It helps me quote the next one better.
Writing them

Small habits that get a reply

Pushy is mostly the shape of each message, more than how many you send.

  • Name the job and the street. A customer with three estimates needs to know which one is yours.
  • Ask one question per message. Ask two and you’ll get one answer, or none.
  • Make replying cheap: yes or no, pick one of three, or “reply right here.”
  • Send from the number they already know, and sign your name.
  • No fake urgency. If a supplier really is raising prices, say which material and when.
Texting rules

Before you text a customer about a quote

Texts get read fast, which makes them easy to overdo. This is general guidance, not legal advice; check your own situation with counsel.

  1. 01Text people who asked for the estimate, about that estimate. The CTIA messaging guidelines expect customers to agree to texts for a specific purpose, out loud, on a form, or by text, and Twilio's messaging policy limits consent to the subject it was given for. At the visit, ask “OK if I text you about the estimate?”
  2. 02Say who you are and how to stop. Twilio's policy, for one, requires the first message to name the sender and include wording like “Reply STOP to unsubscribe.”
  3. 03When someone opts out, stop. CTIA says to honor plain requests like “please stop texting me,” then send one confirmation and nothing after it.
  4. 04Leave the coupon out. CTIA notes a coupon code can turn an informational text into a promotional one, and it expects written consent before promotional texts.
Keep score

Track sent, won, lost, and the reason why

Three numbers a month tell you whether follow-up works: estimates sent, won, and lost. Close rate is won divided by sent. One spreadsheet row per estimate is enough: date, customer, job, amount, status, and lost reason. If your field software marks estimates approved or declined, you have the first three; if it doesn't record why, add the reason as a tag.

The lost reason is the column that pays. Keep the choices short:

  • Price. If it clusters on one kind of job, fix the estimate (options, a smaller first phase), not the follow-up.
  • Timing. Set one check-back date and keep it.
  • Went with someone else. Ask who. Over a season you’ll see who you lose to, and on what work.
  • Decided not to do it. Count it so it doesn’t hide inside price.
  • Never heard back. If this is the biggest pile, the follow-up is the problem.

Also note how long each estimate took to decide. If most wins come back inside two weeks, a day-21 close-out fits. If your big jobs take six weeks, stretch the cadence for those.

Use what you pay for

What Jobber, Housecall Pro, and ServiceTitan already do

The follow-up timer may already be in your plan. Turn it on and rewrite its messages before you buy another tool. This is what each vendor's help docs say as of October 2026.

Jobber

Quote follow-ups, on the Connect plan and up, send up to two reminders for quotes still awaiting a response, up to 90 days out, the same way the quote went (text or email), in wording you can edit. A customer only gets them if “outstanding quote follow-ups” is on in their communication settings. Another automation archives quotes left waiting.

Housecall Pro

Pipeline's estimate automations resend the estimate at three follow-up stages on days you set, by email or text to match how it was sent, and can mark it declined after the third. On Hold pauses them. You can edit the messages, but with Smart Recommendations on, not the timing. Check that your account has Pipeline.

ServiceTitan

Unsold estimates land on the Follow Up screen as opportunities, with good, better, and best grouped as one, and you log each call there. Marketing Pro can send up to four texts per unsold-estimate campaign that can link to the open estimate and stop once a job is booked. A Virtual Agent for unsold estimates that answers questions from the estimate is in private preview.

Whichever you run, swap the stock wording for the templates above. Then test the stop: send an estimate to your own phone, reply to the first reminder, and see whether the next one still goes out.

When to build

When the follow-up needs to read the estimate

Built-in reminders send the same words to everyone on a timer. For most small shops that's enough. A custom build pays when the follow-up has to know:

  • What's in the estimate and your visit notes, so it can say “the gutter guards are line 6” instead of resending the PDF.
  • Your real calendar, so “my next open start is the 14th” is true the day it's sent.
  • The financing you actually offer, so the options touch can mention it.
  • The customer's reply. “Does that include haul-away?” needs an answer or a handoff to you, not touch four on schedule.

That's a build on top of the software you already run, the kind of workflow automation for quoting and follow-up I do, and it's the same trade-off as a canned drip versus software wired into your records. Skip it if you send a handful of estimates a week. On ServiceTitan, see what the Virtual Agent preview becomes first.

Keep reading

Find out what quiet quotes cost you

When the reminders in your field software stop being enough, I build follow-up that reads the estimate, checks the calendar, and hands every reply to a person, on top of the software you already run. It starts with a one-week $4,500 operations audit that measures your quoting and follow-up, credited toward the build. If it doesn't find savings worth more than it costs, you don't pay.

How workflow automation works →

Work together

Book a call with Nick

Pick a timeA 30-minute call with Nick. The calendar opens in a new tab.

Or email nick@nickgeorgeai.com